Abstract
We study the problem of on-line scheduling of parallel jobs on two machines. The jobs are parallel in the sense that each of them specifies the number of processors, in this case 1 or 2, required for simultaneous processing. The jobs are presented one by one. Upon receiving a job, we must assign the job to a time slot in the schedule before the next job is presented. No re-assignment is allowed. The goal is to minimize the makespan of the final schedule. There is a straightforward algorithm which achieves a competitive ratio of 2. In this paper we show that no on-line algorithm can have a competitive ratio less than 1 + sqrt(2 / 3)(≈ 1.816) . We also study two special cases of the problem: (i) Jobs arrive in a non-decreasing order of processing times where we give an optimal algorithm with competitive ratio 3/2; (ii) Jobs arrive in a non-increasing order of processing times where we show that no on-line algorithm has a competitive ratio less than 9/7 and give a greedy algorithm with a competitive ratio 4/3.
| Original language | English |
|---|---|
| Pages (from-to) | 3-10 |
| Number of pages | 8 |
| Journal | Journal of Discrete Algorithms |
| Volume | 6 |
| Issue number | 1 |
| Early online date | 25 Oct 2006 |
| DOIs | |
| Publication status | Published - Mar 2008 |
User-Defined Keywords
- Competitive Analysis
- Jobs scheduling
- Online algorithms
Fingerprint
Dive into the research topics of 'On-line scheduling of parallel jobs on two machines'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver