Long-Lead Seasonal Prediction of Streamflow over the Upper Colorado River Basin: The Role of the Pacific Sea Surface Temperature and Beyond

Siyu Zhao, Rong Fu, Yizhou ZHUANG, Gaoyun Wang

Research output: Contribution to journalJournal articlepeer-review

14 Citations (Scopus)

Fingerprint

Dive into the research topics of 'Long-Lead Seasonal Prediction of Streamflow over the Upper Colorado River Basin: The Role of the Pacific Sea Surface Temperature and Beyond'. Together they form a unique fingerprint.

Keyphrases

Earth and Planetary Sciences